If I’m adding to an existing house how long does it take to get a lift installed?

Retro fitting a lift into a existing dwelling is much more complex as there are strict guidelines for both building and lift works. 

Timeframes for the retrofitting of a lift will normally consist of:

  • Design & Planning – Dependant on the path taken to get the works completed
  • Basic Planning Permits required: 3-12 weeks.
  • Technical Planning Permits required: 3-6 months
  • Hall Group’s average building timeline is 8-12 weeks. Dependant on the difficulty & scale of the project.